• Home
  • Projects
  • Product Index
  • Moisture Control
  • Primers
  • Self-Leveling Underlayments
  • Skimming & Patching | Interior & Exterior Concrete Floors
  • Self-Leveling Toppings | Specified Surfaces Florida
  • Adhesives | Carpet, Flooring & Wall Tile Florida
  • Tile & Stone Systems
  • Services
  • Contact
Menu

Specified Surfaces New Smyrna Beach Florida

1982 SR 44 Suite 204
New Smyrna Beach, FL 32168
866-250-3624 / 866-850-0797 f
Proven Products, Guaranteed Performance

Your Custom Text Here

Specified Surfaces New Smyrna Beach Florida

  • Home
  • Projects
    • Mountain Point Medical
    • Cleveland Clinic
    • Guam Regional Medical Center
    • California State Polytechnic
    • Intel
    • University Medical Center
    • American Eagle Outfitters
    • Orlando VA Hospital
    • Sarasota Memorial Hospital
    • TPA - Airside F
    • Embassy Suites
    • Fresenius Medical Care
    • CHS Behavioral Health Center
    • UF Shands MOB
    • West Palm Hospital Expansion
    • South Georgia Medical Center
    • Manatee Technical Institute
    • St Francis Hospital
    • Toys R Us
    • Nemours Childrens Hospital
  • Products
    • Product Index
    • Moisture Control
    • Primers
    • Self-Leveling Underlayments
    • Skimming & Patching | Interior & Exterior Concrete Floors
    • Self-Leveling Toppings | Specified Surfaces Florida
    • Adhesives | Carpet, Flooring & Wall Tile Florida
    • Tile & Stone Systems
  • Services
  • Contact
UMC New Orleans.png

University Medical Center, LSU New Orleans | Moisture Mitigation

Project Size
900,000 Sq Ft

Project Location
New Orleans, Lousiana
    
General Contractor
Skanska - MAPP

Architect
NBBJ

System Completed
October 2014

Products Supplied  
MAPEI Moisture/Alkalinity Control System
Planiseal MVR, Primer T, Ultraplan 1 Plus

At 900,000 sf, the new University Medical Center at LSU represents one of the largest healthcare projects constructed in the southeastern US in the last decade. With construction slated for completion in 2015, the process of developing the approved sub-floor preparation system began in 2011.

Specified Surfaces evaluated the original multi-manufacturer specified system and worked closely with Skanska/MAPP and NBBJ to develop a MAPEI single-source system, designed to cost-effectively deliver optimum compatibility and maximum warranty protection to the owner.

Onsite pre-construction meetings were utilized to evaluate project conditions, installation phasing options and establish a critical path process to help drive completion schedule.  Specified Surfaces provided the AIA submittal package and system specification to Skanska/MAPP for final approval by NBBJ Architects in conjunction with UMC.

From pre-construction through project close-out, Specified Surfaces worked with the project team of two flooring contractors, the sub-floor preparation contractor and two General Contractors to maintain project schedule and overcome logistical challenges. Regular conference calls and several site meetings were employed during construction to ensure optimum production and rigorous maintenance of installation quality control throughout the fifteen month sub-floor preparation phase of the project, which was completed ahead of schedule.

University Medical Center, LSU New Orleans | Moisture Mitigation

Project Size
900,000 Sq Ft

Project Location
New Orleans, Lousiana
    
General Contractor
Skanska - MAPP

Architect
NBBJ

System Completed
October 2014

Products Supplied  
MAPEI Moisture/Alkalinity Control System
Planiseal MVR, Primer T, Ultraplan 1 Plus

At 900,000 sf, the new University Medical Center at LSU represents one of the largest healthcare projects constructed in the southeastern US in the last decade. With construction slated for completion in 2015, the process of developing the approved sub-floor preparation system began in 2011.

Specified Surfaces evaluated the original multi-manufacturer specified system and worked closely with Skanska/MAPP and NBBJ to develop a MAPEI single-source system, designed to cost-effectively deliver optimum compatibility and maximum warranty protection to the owner.

Onsite pre-construction meetings were utilized to evaluate project conditions, installation phasing options and establish a critical path process to help drive completion schedule.  Specified Surfaces provided the AIA submittal package and system specification to Skanska/MAPP for final approval by NBBJ Architects in conjunction with UMC.

From pre-construction through project close-out, Specified Surfaces worked with the project team of two flooring contractors, the sub-floor preparation contractor and two General Contractors to maintain project schedule and overcome logistical challenges. Regular conference calls and several site meetings were employed during construction to ensure optimum production and rigorous maintenance of installation quality control throughout the fifteen month sub-floor preparation phase of the project, which was completed ahead of schedule.